Kitchen
The existing
burners were seen to be unserviceable and have been
replaced with new, more efficient cooking rings. |
|
Central Heating
The central heating systems in
the main Darbar and small Langar hall have been
renewed. This entailed removal of the old system and
installation of new boilers, pipework, radiators and
control circuits.
|
|
Redecoration
The main Darbar, small Langar
hall and the common area between them have all had a
much needed complete redecoration |
|
Carpeting
The main
Darbar has now been completely re-carpeted, the
first time since the Gurdwara was first opened. New
cover sheets have been ordered and (hopefully) will
be in use from late March 2008.
|
|
Current Projects
The
heating system in the large Langar hall has never
proved to be adequate. We are currently looking into
possible solutions with a view to complete any
necessary works as soon as is practical.
The stage area of the main
Langar hall has been measured for new curtains which
should be installed before April 2008
Major building movement has
been reported to the insurers and is currently being
monitored before repairs can be undertaken. It is
hoped that the committee will be in a position to
proceed with this during 2008/09 |